CM 01/25 - Electrical Balance of Plant Works for Oweninny Windfarm Phase 3

Bord na Móna PLC · Írsko

Zobraziť oznámenia pod týmto názvom
Lehota Neuvedené
Predpokladaná hodnotaNeuvedené
Zverejnené15. 5. 2026
Otvoriť oficiálne oznámenie ↗

Oficiálne zhrnutie · English

Čo je predmetom obstarávania?

In summary, the works comprise of the design, procurement, installation and commissioning of the electrical engineering works in relation to Oweninny Phase 3 wind farm including: (a) Oweninny 110 kV IPP/TSO Substation (b) Contestably built 110 kV grid connection (c) All required design studies, commissioning and testing to ensure the works, delivered as part of this specification, meet the EirGrid Grid Code Requirements. The full project technical specification (the “Employer’s Requirements”) is set out in the documents folder on eTenders and is titled “Schedule 1 Employers Requirements”.

História oznámení

Časová os verejného obstarávania

Sledujte hlavné etapy a aktualizácie súvisiace s týmto postupom verejného obstarávania.

Zatiaľ sa nenašlo žiadne ďalšie súvisiace oznámenie.

  1. Oznámenie o výsledku Aktuálne oznámenie

    · TED 334461-2026

    Otvoriť oficiálne oznámenie ↗

Údaje sú upravené na ľahšie čítanie. Oficiálne oznámenie a súťažné podklady majú vždy prednosť.

Zdroj a spoľahlivosť

TED · 334461-2026. Overené 22. 8. 2026, 8:05.

Údaje sú upravené na ľahšie čítanie. Oficiálne oznámenie a súťažné podklady majú vždy prednosť.

Nahlásiť chybu e-mailom