CM 01/25 - Electrical Balance of Plant Works for Oweninny Windfarm Phase 3

Bord na Móna PLC · Irlanda

Vedi gli avvisi con questo nome
Scadenza Non indicato
Valore stimatoNon indicato
Pubblicato15 mag 2026
Apri l’avviso ufficiale ↗

Sintesi ufficiale · English

Che cosa viene acquistato?

In summary, the works comprise of the design, procurement, installation and commissioning of the electrical engineering works in relation to Oweninny Phase 3 wind farm including: (a) Oweninny 110 kV IPP/TSO Substation (b) Contestably built 110 kV grid connection (c) All required design studies, commissioning and testing to ensure the works, delivered as part of this specification, meet the EirGrid Grid Code Requirements. The full project technical specification (the “Employer’s Requirements”) is set out in the documents folder on eTenders and is titled “Schedule 1 Employers Requirements”.

Cronologia dell’avviso

Cronologia della procedura di appalto

Segui le fasi principali e gli aggiornamenti relativi a questa procedura di appalto.

Non è stato ancora individuato nessun altro avviso correlato.

  1. Avviso di aggiudicazione Avviso corrente

    · TED 334461-2026

    Apri l’avviso ufficiale ↗

I dati sono riorganizzati per agevolarne la lettura. L’avviso ufficiale e i documenti di gara prevalgono sempre.

Fonte e affidabilità

TED · 334461-2026. Verificato il 22 ago 2026, 08:05.

I dati sono riorganizzati per agevolarne la lettura. L’avviso ufficiale e i documenti di gara prevalgono sempre.

Segnala un errore via e-mail