Oddano TED · Vir · Jezik: English

Irska · Gradbena dela

Uradni naslov · English

CM 01/25 - Electrical Balance of Plant Works for Oweninny Windfarm Phase 3

Bord na Móna PLC · Irska

Oglejte si objave pod tem imenom
Rok Ni navedeno
Ocenjena vrednostNi navedeno
Objavljeno15. maj 2026
Odprite uradno obvestilo ↗

Uradni povzetek · English

Kaj je predmet naročila?

In summary, the works comprise of the design, procurement, installation and commissioning of the electrical engineering works in relation to Oweninny Phase 3 wind farm including: (a) Oweninny 110 kV IPP/TSO Substation (b) Contestably built 110 kV grid connection (c) All required design studies, commissioning and testing to ensure the works, delivered as part of this specification, meet the EirGrid Grid Code Requirements. The full project technical specification (the “Employer’s Requirements”) is set out in the documents folder on eTenders and is titled “Schedule 1 Employers Requirements”.

Zgodovina obvestil

Časovnica postopka javnega naročanja

Spremljajte glavne faze in posodobitve, povezane s tem postopkom javnega naročanja.

Za zdaj ni bilo najdeno nobeno drugo povezano obvestilo.

  1. Obvestilo o rezultatih Trenutno obvestilo

    · TED 334461-2026

    Odprite uradno obvestilo ↗

Podatki so preurejeni za lažje branje. Uradno obvestilo in razpisna dokumentacija vedno veljata.

Vir in zanesljivost

TED · 334461-2026. Preverjeno 22. avg. 2026 08:05.

Podatki so preurejeni za lažje branje. Uradno obvestilo in razpisna dokumentacija vedno veljata.

Prijavite napako po e-pošti