Dodijeljeno TED · Izvor · Jezik: English

Irska · Građevinski radovi

Službeni naslov · English

CM 01/25 - Electrical Balance of Plant Works for Oweninny Windfarm Phase 3

Bord na Móna PLC · Irska

Pogledajte objave pod ovim nazivom
Rok Nije objavljeno
Procijenjena vrijednostNije objavljeno
Objavljeno15. svi 2026.
Otvorite službenu obavijest ↗

Službeni sažetak · English

Što se nabavlja?

In summary, the works comprise of the design, procurement, installation and commissioning of the electrical engineering works in relation to Oweninny Phase 3 wind farm including: (a) Oweninny 110 kV IPP/TSO Substation (b) Contestably built 110 kV grid connection (c) All required design studies, commissioning and testing to ensure the works, delivered as part of this specification, meet the EirGrid Grid Code Requirements. The full project technical specification (the “Employer’s Requirements”) is set out in the documents folder on eTenders and is titled “Schedule 1 Employers Requirements”.

Povijest obavijesti

Vremenski slijed postupka nabave

Pratite glavne faze i izmjene povezane s ovim postupkom nabave.

Još nije pronađena nijedna druga povezana obavijest.

  1. Obavijest o rezultatu Trenutačna obavijest

    · TED 334461-2026

    Otvorite službenu obavijest ↗

Podaci su preuređeni radi lakšeg čitanja. Službena obavijest i dokumentacija uvijek imaju prednost.

Izvor i pouzdanost

TED · 334461-2026. Provjereno 22. kol 2026. 08:05.

Podaci su preuređeni radi lakšeg čitanja. Službena obavijest i dokumentacija uvijek imaju prednost.

Prijavite pogrešku e-poštom