Leping sõlmitud TED · Allikas · Keel: English

Iirimaa · Ehitustööd

Ametlik pealkiri · English

CM 01/25 - Electrical Balance of Plant Works for Oweninny Windfarm Phase 3

Bord na Móna PLC · Iirimaa

Vaata selle nimega teateid
Tähtaeg Teatamata
Eeldatav maksumusTeatamata
Avaldatud15. mai 2026
Avage ametlik teade ↗

Ametlik kokkuvõte · English

Mida hangitakse?

In summary, the works comprise of the design, procurement, installation and commissioning of the electrical engineering works in relation to Oweninny Phase 3 wind farm including: (a) Oweninny 110 kV IPP/TSO Substation (b) Contestably built 110 kV grid connection (c) All required design studies, commissioning and testing to ensure the works, delivered as part of this specification, meet the EirGrid Grid Code Requirements. The full project technical specification (the “Employer’s Requirements”) is set out in the documents folder on eTenders and is titled “Schedule 1 Employers Requirements”.

Teate ajalugu

Hankemenetluse ajajoon

Jälgige selle hankemenetlusega seotud põhietappe ja uuendusi.

Ühtegi muud seotud teadet ei ole veel tuvastatud.

  1. Tulemusteade Praegune teade

    · TED 334461-2026

    Avage ametlik teade ↗

Andmed on lihtsamaks lugemiseks ümber struktureeritud. Alati on ülimuslikud ametlik teade ja hankedokumendid.

Allikas ja usaldusväärsus

TED · 334461-2026. Kontrollitud 22. aug 2026 08:05.

Andmed on lihtsamaks lugemiseks ümber struktureeritud. Alati on ülimuslikud ametlik teade ja hankedokumendid.

Teata veast e-posti teel