Piešķirts TED · Avots · Valoda: English

Īrija · Būvdarbi

Oficiālais nosaukums · English

CM 01/25 - Electrical Balance of Plant Works for Oweninny Windfarm Phase 3

Bord na Móna PLC · Īrija

Skatīt paziņojumus ar šo nosaukumu
Termiņš Nav paziņots
Paredzamā vērtībaNav paziņots
Publicēts2026. gada 15. maijs
Atvērt oficiālo paziņojumu ↗

Oficiālais kopsavilkums · English

Kas tiek iepirkts?

In summary, the works comprise of the design, procurement, installation and commissioning of the electrical engineering works in relation to Oweninny Phase 3 wind farm including: (a) Oweninny 110 kV IPP/TSO Substation (b) Contestably built 110 kV grid connection (c) All required design studies, commissioning and testing to ensure the works, delivered as part of this specification, meet the EirGrid Grid Code Requirements. The full project technical specification (the “Employer’s Requirements”) is set out in the documents folder on eTenders and is titled “Schedule 1 Employers Requirements”.

Paziņojuma vēsture

Iepirkuma procedūras laika skala

Sekojiet galvenajiem posmiem un atjauninājumiem, kas saistīti ar šo iepirkuma procedūru.

Cits saistīts paziņojums vēl nav identificēts.

  1. Rezultātu paziņojums Pašreizējais paziņojums

    · TED 334461-2026

    Atvērt oficiālo paziņojumu ↗

Dati ir pārstrukturēti vieglākai lasīšanai. Oficiālais paziņojums un iepirkuma dokumenti vienmēr ir noteicošie.

Avots un uzticamība

TED · 334461-2026. Pārbaudīts 2026. gada 22. aug. 08:05.

Dati ir pārstrukturēti vieglākai lasīšanai. Oficiālais paziņojums un iepirkuma dokumenti vienmēr ir noteicošie.

Ziņot par kļūdu e-pastā