In summary, the works comprise of the design, procurement, installation and commissioning of the electrical engineering works in relation to Oweninny Phase 3 wind farm including: (a) Oweninny 110 kV IPP/TSO Substation (b) Contestably built 110 kV grid connection (c) All required design studies, commissioning and testing to ensure the works, delivered as part of this specification, meet the EirGrid Grid Code Requirements. The full project technical specification (the “Employer’s Requirements”) is set out in the documents folder on eTenders and is titled “Schedule 1 Employers Requirements”.
Pomocnicze tłumaczenie maszynowe. Oficjalne podsumowanie pozostaje rozstrzygające.
Oficjalne podsumowanie · English
In summary, the works comprise of the design, procurement, installation and commissioning of the electrical engineering works in relation to Oweninny Phase 3 wind farm including: (a) Oweninny 110 kV IPP/TSO Substation (b) Contestably built 110 kV grid connection (c) All required design studies, commissioning and testing to ensure the works, delivered as part of this specification, meet the EirGrid Grid Code Requirements. The full project technical specification (the “Employer’s Requirements”) is set out in the documents folder on eTenders and is titled “Schedule 1 Employers Requirements”.
Historia ogłoszeń
Oś czasu postępowania o udzielenie zamówienia
Śledź główne etapy i aktualizacje powiązane z tym postępowaniem o udzielenie zamówienia.
Nie znaleziono jeszcze żadnego innego powiązanego ogłoszenia.
Dane uporządkowano dla łatwiejszego czytania. Zawsze rozstrzygają oficjalne ogłoszenie i dokumenty zamówienia.
Źródło i wiarygodność
TED · 334461-2026. Sprawdzono 22 sie 2026, 08:05.
Dane uporządkowano dla łatwiejszego czytania. Zawsze rozstrzygają oficjalne ogłoszenie i dokumenty zamówienia.