In summary, the works comprise of the design, procurement, installation and commissioning of the electrical engineering works in relation to Oweninny Phase 3 wind farm including: (a) Oweninny 110 kV IPP/TSO Substation (b) Contestably built 110 kV grid connection (c) All required design studies, commissioning and testing to ensure the works, delivered as part of this specification, meet the EirGrid Grid Code Requirements. The full project technical specification (the “Employer’s Requirements”) is set out in the documents folder on eTenders and is titled “Schedule 1 Employers Requirements”.
Traduzzjoni awtomatika indikattiva. Is-sommarju uffiċjali jibqa’ r-referenza.
Sommarju uffiċjali · English
In summary, the works comprise of the design, procurement, installation and commissioning of the electrical engineering works in relation to Oweninny Phase 3 wind farm including: (a) Oweninny 110 kV IPP/TSO Substation (b) Contestably built 110 kV grid connection (c) All required design studies, commissioning and testing to ensure the works, delivered as part of this specification, meet the EirGrid Grid Code Requirements. The full project technical specification (the “Employer’s Requirements”) is set out in the documents folder on eTenders and is titled “Schedule 1 Employers Requirements”.
Storja tal-avviżi
Kronoloġija tal-akkwist
Segwi l-istadji ewlenin u l-aġġornamenti marbuta ma’ din il-proċedura ta’ akkwist.
S’issa ma ġie identifikat l-ebda avviż ieħor relatat.
Id-data hija ristrutturata biex tinqara aktar faċilment. L-avviż uffiċjali u d-dokumenti tal-akkwist dejjem jipprevalu.
Sors u affidabbiltà
TED · 334461-2026. Iċċekkjat fil-22 Aww 2026 08:05.
Id-data hija ristrutturata biex tinqara aktar faċilment. L-avviż uffiċjali u d-dokumenti tal-akkwist dejjem jipprevalu.