Mogħti TED · Sors · Lingwa: English

l-Irlanda · Xogħlijiet ta’ kostruzzjoni

Titlu uffiċjali · English

CM 01/25 - Electrical Balance of Plant Works for Oweninny Windfarm Phase 3

Bord na Móna PLC · l-Irlanda

Ara avviżi taħt dan l-isem
Skadenza Mhux imħabbar
Valur stmatMhux imħabbar
Ippubblikat15 Mej 2026
Iftaħ l-avviż uffiċjali ↗

Sommarju uffiċjali · English

X’qed jiġi akkwistat?

In summary, the works comprise of the design, procurement, installation and commissioning of the electrical engineering works in relation to Oweninny Phase 3 wind farm including: (a) Oweninny 110 kV IPP/TSO Substation (b) Contestably built 110 kV grid connection (c) All required design studies, commissioning and testing to ensure the works, delivered as part of this specification, meet the EirGrid Grid Code Requirements. The full project technical specification (the “Employer’s Requirements”) is set out in the documents folder on eTenders and is titled “Schedule 1 Employers Requirements”.

Storja tal-avviżi

Kronoloġija tal-akkwist

Segwi l-istadji ewlenin u l-aġġornamenti marbuta ma’ din il-proċedura ta’ akkwist.

S’issa ma ġie identifikat l-ebda avviż ieħor relatat.

  1. Avviż tar-riżultat Avviż attwali

    · TED 334461-2026

    Iftaħ l-avviż uffiċjali ↗

Id-data hija ristrutturata biex tinqara aktar faċilment. L-avviż uffiċjali u d-dokumenti tal-akkwist dejjem jipprevalu.

Sors u affidabbiltà

TED · 334461-2026. Iċċekkjat fil-22 Aww 2026 08:05.

Id-data hija ristrutturata biex tinqara aktar faċilment. L-avviż uffiċjali u d-dokumenti tal-akkwist dejjem jipprevalu.

Irrapporta żball bl-email