Atribuit TED · Sursă · Limbă: English

Irlanda · Lucrări de construcții

Titlu oficial · English

CM 01/25 - Electrical Balance of Plant Works for Oweninny Windfarm Phase 3

Bord na Móna PLC · Irlanda

Vezi anunțurile sub acest nume
Termen-limită Neanunțat
Valoare estimatăNeanunțat
Publicat15 mai 2026
Deschideți anunțul oficial ↗

Rezumat oficial · English

Ce se achiziționează?

In summary, the works comprise of the design, procurement, installation and commissioning of the electrical engineering works in relation to Oweninny Phase 3 wind farm including: (a) Oweninny 110 kV IPP/TSO Substation (b) Contestably built 110 kV grid connection (c) All required design studies, commissioning and testing to ensure the works, delivered as part of this specification, meet the EirGrid Grid Code Requirements. The full project technical specification (the “Employer’s Requirements”) is set out in the documents folder on eTenders and is titled “Schedule 1 Employers Requirements”.

Istoricul anunțului

Cronologia procedurii de achiziție

Urmăriți principalele etape și actualizări legate de această procedură de achiziție.

Nu a fost identificat încă niciun alt anunț asociat.

  1. Anunț privind rezultatul Anunțul curent

    · TED 334461-2026

    Deschideți anunțul oficial ↗

Datele sunt restructurate pentru o lectură mai ușoară. Anunțul oficial și documentele achiziției prevalează întotdeauna.

Sursă și fiabilitate

TED · 334461-2026. Verificat la 22 aug. 2026, 08:05.

Datele sunt restructurate pentru o lectură mai ușoară. Anunțul oficial și documentele achiziției prevalează întotdeauna.

Semnalați o eroare prin e-mail