Ce se achiziționează?
In summary, the works comprise of the design, procurement, installation and commissioning of the electrical engineering works in relation to Oweninny Phase 3 wind farm including: (a) Oweninny 110 kV IPP/TSO Substation (b) Contestably built 110 kV grid connection (c) All required design studies, commissioning and testing to ensure the works, delivered as part of this specification, meet the EirGrid Grid Code Requirements. The full project technical specification (the “Employer’s Requirements”) is set out in the documents folder on eTenders and is titled “Schedule 1 Employers Requirements”.
Traducere automată orientativă. Rezumatul oficial rămâne referința.
Rezumat oficial · English
In summary, the works comprise of the design, procurement, installation and commissioning of the electrical engineering works in relation to Oweninny Phase 3 wind farm including: (a) Oweninny 110 kV IPP/TSO Substation (b) Contestably built 110 kV grid connection (c) All required design studies, commissioning and testing to ensure the works, delivered as part of this specification, meet the EirGrid Grid Code Requirements. The full project technical specification (the “Employer’s Requirements”) is set out in the documents folder on eTenders and is titled “Schedule 1 Employers Requirements”.
Istoricul anunțului
Cronologia procedurii de achiziție
Urmăriți principalele etape și actualizări legate de această procedură de achiziție.
Nu a fost identificat încă niciun alt anunț asociat.
Datele sunt restructurate pentru o lectură mai ușoară. Anunțul oficial și documentele achiziției prevalează întotdeauna.
Sursă și fiabilitate
TED · 334461-2026. Verificat la 22 aug. 2026, 08:05.
Datele sunt restructurate pentru o lectură mai ușoară. Anunțul oficial și documentele achiziției prevalează întotdeauna.