CM 01/25 - Electrical Balance of Plant Works for Oweninny Windfarm Phase 3

Bord na Móna PLC · Irland

Se udbud under dette navn
Frist Ikke oplyst
Anslået værdiIkke oplyst
Offentliggjort15. maj 2026
Åbn officiel meddelelse ↗

Officielt resumé · English

Hvad indkøbes?

In summary, the works comprise of the design, procurement, installation and commissioning of the electrical engineering works in relation to Oweninny Phase 3 wind farm including: (a) Oweninny 110 kV IPP/TSO Substation (b) Contestably built 110 kV grid connection (c) All required design studies, commissioning and testing to ensure the works, delivered as part of this specification, meet the EirGrid Grid Code Requirements. The full project technical specification (the “Employer’s Requirements”) is set out in the documents folder on eTenders and is titled “Schedule 1 Employers Requirements”.

Meddelelseshistorik

Udbudsforløb

Følg de vigtigste faser og opdateringer i dette udbud.

Der er endnu ikke fundet en anden relateret meddelelse.

  1. Resultatmeddelelse Aktuel meddelelse

    · TED 334461-2026

    Åbn officiel meddelelse ↗

Data er omstruktureret for at være lettere at læse. Den officielle meddelelse og udbudsdokumenterne er altid gældende.

Kilde og pålidelighed

TED · 334461-2026. Kontrolleret 22. aug. 2026 08.05.

Data er omstruktureret for at være lettere at læse. Den officielle meddelelse og udbudsdokumenterne er altid gældende.

Indberet en fejl via e-mail