Vergeben TED · Quelle · Sprache: English

Irland · Bauarbeiten

Amtlicher Titel · English

CM 01/25 - Electrical Balance of Plant Works for Oweninny Windfarm Phase 3

Bord na Móna PLC · Irland

Bekanntmachungen unter diesem Namen ansehen
Frist Nicht angegeben
Geschätzter WertNicht angegeben
Veröffentlicht15.05.2026
Amtliche Bekanntmachung öffnen ↗

Amtliche Zusammenfassung · English

Was wird beschafft?

In summary, the works comprise of the design, procurement, installation and commissioning of the electrical engineering works in relation to Oweninny Phase 3 wind farm including: (a) Oweninny 110 kV IPP/TSO Substation (b) Contestably built 110 kV grid connection (c) All required design studies, commissioning and testing to ensure the works, delivered as part of this specification, meet the EirGrid Grid Code Requirements. The full project technical specification (the “Employer’s Requirements”) is set out in the documents folder on eTenders and is titled “Schedule 1 Employers Requirements”.

Bekanntmachungsverlauf

Zeitlicher Ablauf des Vergabeverfahrens

Verfolgen Sie die wichtigsten Phasen und Aktualisierungen dieses Vergabeverfahrens.

Bisher wurde keine weitere zugehörige Bekanntmachung ermittelt.

  1. Bekanntmachung vergebener Aufträge Aktuelle Bekanntmachung

    · TED 334461-2026

    Amtliche Bekanntmachung öffnen ↗

Die Daten werden für eine leichtere Lesbarkeit neu strukturiert. Maßgeblich sind stets die amtliche Bekanntmachung und die Vergabeunterlagen.

Quelle und Verlässlichkeit

TED · 334461-2026. Geprüft am 22.08.2026, 08:05.