Oficiální shrnutí · English
Co je předmětem zakázky?
In summary, the works comprise of the design, procurement, installation and commissioning of the electrical engineering works in relation to Oweninny Phase 3 wind farm including: (a) Oweninny 110 kV IPP/TSO Substation (b) Contestably built 110 kV grid connection (c) All required design studies, commissioning and testing to ensure the works, delivered as part of this specification, meet the EirGrid Grid Code Requirements. The full project technical specification (the “Employer’s Requirements”) is set out in the documents folder on eTenders and is titled “Schedule 1 Employers Requirements”.
Orientační strojový překlad. Rozhodující zůstává oficiální shrnutí.
Oficiální shrnutí · English
In summary, the works comprise of the design, procurement, installation and commissioning of the electrical engineering works in relation to Oweninny Phase 3 wind farm including: (a) Oweninny 110 kV IPP/TSO Substation (b) Contestably built 110 kV grid connection (c) All required design studies, commissioning and testing to ensure the works, delivered as part of this specification, meet the EirGrid Grid Code Requirements. The full project technical specification (the “Employer’s Requirements”) is set out in the documents folder on eTenders and is titled “Schedule 1 Employers Requirements”.
Historie oznámení
Časová osa zadávacího řízení
Sledujte hlavní fáze a aktualizace spojené s tímto zadávacím řízením.
Dosud nebylo nalezeno žádné další související oznámení.
Data jsou upravena pro snazší čtení. Oficiální oznámení a zadávací dokumentace mají vždy přednost.
Zdroj a spolehlivost
TED · 334461-2026. Ověřeno 22. 8. 2026 8:05.
Data jsou upravena pro snazší čtení. Oficiální oznámení a zadávací dokumentace mají vždy přednost.