Tilldelad TED · Källa · Språk: English

Irland · Bygg- och anläggningsarbeten

Officiell titel · English

CM 01/25 - Electrical Balance of Plant Works for Oweninny Windfarm Phase 3

Bord na Móna PLC · Irland

Visa annonser under detta namn
Tidsfrist Ej angivet
Uppskattat värdeEj angivet
Publicerat15 maj 2026
Öppna officiellt meddelande ↗

Officiell sammanfattning · English

Vad upphandlas?

In summary, the works comprise of the design, procurement, installation and commissioning of the electrical engineering works in relation to Oweninny Phase 3 wind farm including: (a) Oweninny 110 kV IPP/TSO Substation (b) Contestably built 110 kV grid connection (c) All required design studies, commissioning and testing to ensure the works, delivered as part of this specification, meet the EirGrid Grid Code Requirements. The full project technical specification (the “Employer’s Requirements”) is set out in the documents folder on eTenders and is titled “Schedule 1 Employers Requirements”.

Meddelandehistorik

Tidslinje för upphandlingsförfarandet

Följ de viktigaste stegen och uppdateringarna som är kopplade till det här upphandlingsförfarandet.

Inget annat relaterat meddelande har ännu identifierats.

  1. Resultatmeddelande Aktuellt meddelande

    · TED 334461-2026

    Öppna officiellt meddelande ↗

Uppgifterna har strukturerats om för att bli lättare att läsa. Det officiella meddelandet och upphandlingsdokumenten gäller alltid.

Källa och tillförlitlighet

TED · 334461-2026. Kontrollerad 22 aug. 2026 08:05.

Uppgifterna har strukturerats om för att bli lättare att läsa. Det officiella meddelandet och upphandlingsdokumenten gäller alltid.

Rapportera ett fel via e-post