CM 01/25 - Electrical Balance of Plant Works for Oweninny Windfarm Phase 3

Bord na Móna PLC · Ирландия

Вижте обявленията под това име
Краен срок Не е обявено
Прогнозна стойностНе е обявено
Публикувано15.05.2026 г.
Отворете официалното обявление ↗

Официално резюме · English

Какво се възлага?

In summary, the works comprise of the design, procurement, installation and commissioning of the electrical engineering works in relation to Oweninny Phase 3 wind farm including: (a) Oweninny 110 kV IPP/TSO Substation (b) Contestably built 110 kV grid connection (c) All required design studies, commissioning and testing to ensure the works, delivered as part of this specification, meet the EirGrid Grid Code Requirements. The full project technical specification (the “Employer’s Requirements”) is set out in the documents folder on eTenders and is titled “Schedule 1 Employers Requirements”.

История на обявлението

Хронология на процедурата за възлагане

Проследете основните етапи и актуализации, свързани с тази процедура за възлагане.

Все още не е открито друго свързано обявление.

  1. Обявление за резултат Текущо обявление

    · TED 334461-2026

    Отворете официалното обявление ↗

Данните са преструктурирани за по-лесно четене. Официалното обявление и документите винаги имат предимство.

Източник и надеждност

TED · 334461-2026. Проверено на 22.08.2026 г., 8:05 ч..

Данните са преструктурирани за по-лесно четене. Официалното обявление и документите винаги имат предимство.

Съобщете за грешка по имейл