Attribué TED · Source · Langue: English

Irlande · Travaux de construction

Titre officiel · English

CM 01/25 - Electrical Balance of Plant Works for Oweninny Windfarm Phase 3

Bord na Móna PLC · Irlande

Voir les avis sous ce nom
Échéance Non communiqué
Valeur estiméeNon communiqué
Publié15 mai 2026
Ouvrir l’avis officiel ↗

Résumé officiel · English

Quel est l’objet du marché ?

In summary, the works comprise of the design, procurement, installation and commissioning of the electrical engineering works in relation to Oweninny Phase 3 wind farm including: (a) Oweninny 110 kV IPP/TSO Substation (b) Contestably built 110 kV grid connection (c) All required design studies, commissioning and testing to ensure the works, delivered as part of this specification, meet the EirGrid Grid Code Requirements. The full project technical specification (the “Employer’s Requirements”) is set out in the documents folder on eTenders and is titled “Schedule 1 Employers Requirements”.

Historique de l’avis

Chronologie de la procédure

Suivez les principales étapes et mises à jour liées à cette procédure de passation.

Aucun autre avis lié n’a encore été identifié.

  1. Avis d’attribution Avis actuel

    · TED 334461-2026

    Ouvrir l’avis officiel ↗

Les données sont restructurées pour en faciliter la lecture. L’avis officiel et les documents du marché font toujours foi.

Source et fiabilité

TED · 334461-2026. Vérifié le 22 août 2026 à 08:05.

Les données sont restructurées pour en faciliter la lecture. L’avis officiel et les documents du marché font toujours foi.

Signaler une erreur par e-mail