CM 01/25 - Electrical Balance of Plant Works for Oweninny Windfarm Phase 3

Bord na Móna PLC · Irlanda

Ver anúncios com este nome
Prazo Não indicado
Valor estimadoNão indicado
Publicado15 de mai de 2026
Abrir o anúncio oficial ↗

Resumo oficial · English

O que está a ser adquirido?

In summary, the works comprise of the design, procurement, installation and commissioning of the electrical engineering works in relation to Oweninny Phase 3 wind farm including: (a) Oweninny 110 kV IPP/TSO Substation (b) Contestably built 110 kV grid connection (c) All required design studies, commissioning and testing to ensure the works, delivered as part of this specification, meet the EirGrid Grid Code Requirements. The full project technical specification (the “Employer’s Requirements”) is set out in the documents folder on eTenders and is titled “Schedule 1 Employers Requirements”.

Histórico do anúncio

Cronologia do procedimento de contratação pública

Acompanhe as principais etapas e atualizações associadas a este procedimento de contratação pública.

Ainda não foi identificado nenhum outro anúncio relacionado.

  1. Anúncio de resultado Anúncio atual

    · TED 334461-2026

    Abrir o anúncio oficial ↗

Os dados são reorganizados para facilitar a leitura. O anúncio oficial e os documentos do concurso prevalecem sempre.

Fonte e fiabilidade

TED · 334461-2026. Verificado em 22 de ago de 2026 08:05.

Os dados são reorganizados para facilitar a leitura. O anúncio oficial e os documentos do concurso prevalecem sempre.

Comunicar um erro por e-mail