Dámhachtaithe TED · Foinse · Teanga: English

Éire · Oibreacha tógála

Teideal oifigiúil · English

CM 01/25 - Electrical Balance of Plant Works for Oweninny Windfarm Phase 3

Bord na Móna PLC · Éire

Féach ar fhógraí faoin ainm seo
Spriocdháta Gan fógairt
Luach meastaGan fógairt
Foilsithe15 Beal 2026
Oscail an fógra oifigiúil ↗

Achoimre oifigiúil · English

Cad atá á sholáthar?

In summary, the works comprise of the design, procurement, installation and commissioning of the electrical engineering works in relation to Oweninny Phase 3 wind farm including: (a) Oweninny 110 kV IPP/TSO Substation (b) Contestably built 110 kV grid connection (c) All required design studies, commissioning and testing to ensure the works, delivered as part of this specification, meet the EirGrid Grid Code Requirements. The full project technical specification (the “Employer’s Requirements”) is set out in the documents folder on eTenders and is titled “Schedule 1 Employers Requirements”.

Stair na bhfógraí

Amlíne an tsoláthair

Lean na príomhchéimeanna agus na nuashonruithe a bhaineann leis an nós imeachta soláthair seo.

Níor sainaithníodh aon fhógra gaolmhar eile go fóill.

  1. Fógra toraidh Fógra reatha

    · TED 334461-2026

    Oscail an fógra oifigiúil ↗

Tá na sonraí athstruchtúrtha chun iad a léamh níos éasca. Is iad an fógra oifigiúil agus na doiciméid soláthair a bhíonn i réim i gcónaí.

Foinse agus iontaofacht

TED · 334461-2026. Seiceáilte ar 22 Lún 2026 08:05.

Tá na sonraí athstruchtúrtha chun iad a léamh níos éasca. Is iad an fógra oifigiúil agus na doiciméid soláthair a bhíonn i réim i gcónaí.

Tuairiscigh earráid trí ríomhphost