Awarded TED · Source

Finland · Construction work

Official title · English

The construction of 2 x (400 kV + 110 kV) transmission line Toivila - Hikiä, part 3

Fingrid Oyj · Finland

View notices under this name
Official summary

Fingrid Oyj has decided to build new 2 x (400 kV + 110 kV) power lines between Toivila and Hikiä substations. The new transmission lines will be mostly located in the place of the existing 110 kV power lines. Both new transmission lines will be constructed with 400 kV + 110 kV structures. Only 400 kV conductors will be installed on the western transmission line (design code 2055). Both 400 kV and 110 kV conductors will be installed on the eastern…

What is being procured?
Deadline Not announced
Estimated valueNot announced
PublishedJun 30, 2026
Open official notice ↗

Official summary

What is being procured?

Fingrid Oyj has decided to build new 2 x (400 kV + 110 kV) power lines between Toivila and Hikiä substations. The new transmission lines will be mostly located in the place of the existing 110 kV power lines. Both new transmission lines will be constructed with 400 kV + 110 kV structures. Only 400 kV conductors will be installed on the western transmission line (design code 2055). Both 400 kV and 110 kV conductors will be installed on the eastern transmission line (design codes 2084 and 2085). The length of part 3 (Ranttila-Hikiä) is approx. 46 km.

Notice history

Procurement timeline

Follow the main stages and updates linked to this procurement procedure.

No other related notice has been identified yet.

  1. Result notice Current notice

    · TED 446176-2026

    Open official notice ↗

Data is restructured for easier reading. The official notice and procurement documents always prevail.

Source and reliability

TED · 446176-2026. Checked on Aug 23, 2026, 9:05 AM.

Data is restructured for easier reading. The official notice and procurement documents always prevail.

Report an error by email