Official summary
What is being procured?
Fingrid Oyj has decided to build new 2 x (400 kV + 110 kV) power lines between Toivila and Hikiä substations. The new transmission lines will be mostly located in the place of the existing 110 kV power lines. Both new transmission lines will be constructed with 400 kV + 110 kV structures. Only 400 kV conductors will be installed on the western transmission line (design code 2055). Both 400 kV and 110 kV conductors will be installed on the eastern transmission line (design codes 2084 and 2085). The length of part 3 (Ranttila-Hikiä) is approx. 46 km.
Free
Get the next tenders in this sector
Receive new notices matching your criteria in a weekly email. Check or adjust your criteria before activating your free alert.
Notice history
Procurement timeline
Follow the main stages and updates linked to this procurement procedure.
No other related notice has been identified yet.
Data is restructured for easier reading. The official notice and procurement documents always prevail.
Source and reliability
TED · 446176-2026. Checked on Aug 23, 2026, 9:05 AM.
Data is restructured for easier reading. The official notice and procurement documents always prevail.