Fingrid Oyj has decided to build new 2 x (400 kV + 110 kV) power lines between Toivila and Hikiä substations. The new transmission lines will be mostly located in the place of the existing 110 kV power lines. Both new transmission lines will be constructed with 400 kV + 110 kV structures. Only 400 kV conductors will be installed on the western transmission line (design code 2055). Both 400 kV and 110 kV conductors will be installed on the eastern transmission line (design codes 2084 and 2085). The length of part 3 (Ranttila-Hikiä) is approx. 46 km.
Informativni strojni prevod. Uradni povzetek ostaja merodajen.
Uradni povzetek · English
Fingrid Oyj has decided to build new 2 x (400 kV + 110 kV) power lines between Toivila and Hikiä substations. The new transmission lines will be mostly located in the place of the existing 110 kV power lines. Both new transmission lines will be constructed with 400 kV + 110 kV structures. Only 400 kV conductors will be installed on the western transmission line (design code 2055). Both 400 kV and 110 kV conductors will be installed on the eastern transmission line (design codes 2084 and 2085). The length of part 3 (Ranttila-Hikiä) is approx. 46 km.
Brezplačno
Prejemajte prihodnje razpise v tej dejavnosti
Vsak teden prejmite e-pošto z novimi obvestili, ki ustrezajo vašim merilom. Pred vklopom brezplačnega opozorila merila preverite ali prilagodite.
Zgodovina obvestil
Časovnica postopka javnega naročanja
Spremljajte glavne faze in posodobitve, povezane s tem postopkom javnega naročanja.
Za zdaj ni bilo najdeno nobeno drugo povezano obvestilo.
Podatki so preurejeni za lažje branje. Uradno obvestilo in razpisna dokumentacija vedno veljata.
Vir in zanesljivost
TED · 446176-2026. Preverjeno 23. avg. 2026 09:05.
Podatki so preurejeni za lažje branje. Uradno obvestilo in razpisna dokumentacija vedno veljata.