Ametlik kokkuvõte · English
Mida hangitakse?
Fingrid Oyj has decided to build new 2 x (400 kV + 110 kV) power lines between Toivila and Hikiä substations. The new transmission lines will be mostly located in the place of the existing 110 kV power lines. Both new transmission lines will be constructed with 400 kV + 110 kV structures. Only 400 kV conductors will be installed on the western transmission line (design code 2055). Both 400 kV and 110 kV conductors will be installed on the eastern transmission line (design codes 2084 and 2085). The length of part 3 (Ranttila-Hikiä) is approx. 46 km.
Abistav masintõlge. Ametlik kokkuvõte jääb määravaks.
Ametlik kokkuvõte · English
Fingrid Oyj has decided to build new 2 x (400 kV + 110 kV) power lines between Toivila and Hikiä substations. The new transmission lines will be mostly located in the place of the existing 110 kV power lines. Both new transmission lines will be constructed with 400 kV + 110 kV structures. Only 400 kV conductors will be installed on the western transmission line (design code 2055). Both 400 kV and 110 kV conductors will be installed on the eastern transmission line (design codes 2084 and 2085). The length of part 3 (Ranttila-Hikiä) is approx. 46 km.
Tasuta
Saage selle valdkonna järgmised hanked
Saate kord nädalas e-kirja uute teadetega, mis vastavad teie tingimustele. Enne tasuta teavituse aktiveerimist kontrollige või muutke tingimusi.
Teate ajalugu
Hankemenetluse ajajoon
Jälgige selle hankemenetlusega seotud põhietappe ja uuendusi.
Ühtegi muud seotud teadet ei ole veel tuvastatud.
Andmed on lihtsamaks lugemiseks ümber struktureeritud. Alati on ülimuslikud ametlik teade ja hankedokumendid.
Allikas ja usaldusväärsus
TED · 446176-2026. Kontrollitud 23. aug 2026 09:05.
Andmed on lihtsamaks lugemiseks ümber struktureeritud. Alati on ülimuslikud ametlik teade ja hankedokumendid.