Fingrid Oyj has decided to build new 2 x (400 kV + 110 kV) power lines between Toivila and Hikiä substations. The new transmission lines will be mostly located in the place of the existing 110 kV power lines. Both new transmission lines will be constructed with 400 kV + 110 kV structures. Only 400 kV conductors will be installed on the western transmission line (design code 2055). Both 400 kV and 110 kV conductors will be installed on the eastern transmission line (design codes 2084 and 2085). The length of part 3 (Ranttila-Hikiä) is approx. 46 km.
Pomocnicze tłumaczenie maszynowe. Oficjalne podsumowanie pozostaje rozstrzygające.
Oficjalne podsumowanie · English
Fingrid Oyj has decided to build new 2 x (400 kV + 110 kV) power lines between Toivila and Hikiä substations. The new transmission lines will be mostly located in the place of the existing 110 kV power lines. Both new transmission lines will be constructed with 400 kV + 110 kV structures. Only 400 kV conductors will be installed on the western transmission line (design code 2055). Both 400 kV and 110 kV conductors will be installed on the eastern transmission line (design codes 2084 and 2085). The length of part 3 (Ranttila-Hikiä) is approx. 46 km.
Bezpłatnie
Otrzymuj kolejne zamówienia z tej branży
Co tydzień otrzymuj e-mail z nowymi ogłoszeniami pasującymi do Twoich kryteriów. Sprawdź lub zmień kryteria przed włączeniem bezpłatnego alertu.
Historia ogłoszeń
Oś czasu postępowania o udzielenie zamówienia
Śledź główne etapy i aktualizacje powiązane z tym postępowaniem o udzielenie zamówienia.
Nie znaleziono jeszcze żadnego innego powiązanego ogłoszenia.
Dane uporządkowano dla łatwiejszego czytania. Zawsze rozstrzygają oficjalne ogłoszenie i dokumenty zamówienia.
Źródło i wiarygodność
TED · 446176-2026. Sprawdzono 23 sie 2026, 09:05.