Fingrid Oyj has decided to build new 2 x (400 kV + 110 kV) power lines between Toivila and Hikiä substations. The new transmission lines will be mostly located in the place of the existing 110 kV power lines. Both new transmission lines will be constructed with 400 kV + 110 kV structures. Only 400 kV conductors will be installed on the western transmission line (design code 2055). Both 400 kV and 110 kV conductors will be installed on the eastern transmission line (design codes 2084 and 2085). The length of part 3 (Ranttila-Hikiä) is approx. 46 km.
Orientačný strojový preklad. Rozhodujúci zostáva oficiálny súhrn.
Oficiálne zhrnutie · English
Fingrid Oyj has decided to build new 2 x (400 kV + 110 kV) power lines between Toivila and Hikiä substations. The new transmission lines will be mostly located in the place of the existing 110 kV power lines. Both new transmission lines will be constructed with 400 kV + 110 kV structures. Only 400 kV conductors will be installed on the western transmission line (design code 2055). Both 400 kV and 110 kV conductors will be installed on the eastern transmission line (design codes 2084 and 2085). The length of part 3 (Ranttila-Hikiä) is approx. 46 km.
Zadarmo
Získajte ďalšie zákazky v tomto odvetví
Každý týždeň dostanete e-mail s novými oznámeniami podľa vašich kritérií. Pred aktiváciou bezplatného upozornenia kritériá skontrolujte alebo upravte.
História oznámení
Časová os verejného obstarávania
Sledujte hlavné etapy a aktualizácie súvisiace s týmto postupom verejného obstarávania.
Zatiaľ sa nenašlo žiadne ďalšie súvisiace oznámenie.
Údaje sú upravené na ľahšie čítanie. Oficiálne oznámenie a súťažné podklady majú vždy prednosť.
Zdroj a spoľahlivosť
TED · 446176-2026. Overené 23. 8. 2026, 9:05.
Údaje sú upravené na ľahšie čítanie. Oficiálne oznámenie a súťažné podklady majú vždy prednosť.