Fingrid Oyj has decided to build new 2 x (400 kV + 110 kV) power lines between Toivila and Hikiä substations. The new transmission lines will be mostly located in the place of the existing 110 kV power lines. Both new transmission lines will be constructed with 400 kV + 110 kV structures. Only 400 kV conductors will be installed on the western transmission line (design code 2055). Both 400 kV and 110 kV conductors will be installed on the eastern transmission line (design codes 2084 and 2085). The length of part 3 (Ranttila-Hikiä) is approx. 46 km.
Meaisínaistriúchán mar threoir. Is í an achoimre oifigiúil an tagairt údarásach.
Achoimre oifigiúil · English
Fingrid Oyj has decided to build new 2 x (400 kV + 110 kV) power lines between Toivila and Hikiä substations. The new transmission lines will be mostly located in the place of the existing 110 kV power lines. Both new transmission lines will be constructed with 400 kV + 110 kV structures. Only 400 kV conductors will be installed on the western transmission line (design code 2055). Both 400 kV and 110 kV conductors will be installed on the eastern transmission line (design codes 2084 and 2085). The length of part 3 (Ranttila-Hikiä) is approx. 46 km.
Saor in aisce
Faigh na chéad tairiscintí eile san earnáil seo
Faigh ríomhphost seachtainiúil le fógraí nua a oireann do do chritéir. Seiceáil nó athraigh na critéir sula ngníomhachtaíonn tú an foláireamh saor in aisce.
Stair na bhfógraí
Amlíne an tsoláthair
Lean na príomhchéimeanna agus na nuashonruithe a bhaineann leis an nós imeachta soláthair seo.
Níor sainaithníodh aon fhógra gaolmhar eile go fóill.
Tá na sonraí athstruchtúrtha chun iad a léamh níos éasca. Is iad an fógra oifigiúil agus na doiciméid soláthair a bhíonn i réim i gcónaí.
Foinse agus iontaofacht
TED · 446176-2026. Seiceáilte ar 23 Lún 2026 09:05.
Tá na sonraí athstruchtúrtha chun iad a léamh níos éasca. Is iad an fógra oifigiúil agus na doiciméid soláthair a bhíonn i réim i gcónaí.