Fingrid Oyj has decided to build new 2 x (400 kV + 110 kV) power lines between Toivila and Hikiä substations. The new transmission lines will be mostly located in the place of the existing 110 kV power lines. Both new transmission lines will be constructed with 400 kV + 110 kV structures. Only 400 kV conductors will be installed on the western transmission line (design code 2055). Both 400 kV and 110 kV conductors will be installed on the eastern transmission line (design codes 2084 and 2085). The length of part 3 (Ranttila-Hikiä) is approx. 46 km.
Traduzione automatica indicativa. Il riepilogo ufficiale resta il riferimento.
Sintesi ufficiale · English
Fingrid Oyj has decided to build new 2 x (400 kV + 110 kV) power lines between Toivila and Hikiä substations. The new transmission lines will be mostly located in the place of the existing 110 kV power lines. Both new transmission lines will be constructed with 400 kV + 110 kV structures. Only 400 kV conductors will be installed on the western transmission line (design code 2055). Both 400 kV and 110 kV conductors will be installed on the eastern transmission line (design codes 2084 and 2085). The length of part 3 (Ranttila-Hikiä) is approx. 46 km.
Gratuito
Ricevi le prossime gare di questo settore
Ricevi ogni settimana un’e-mail con i nuovi avvisi che corrispondono ai tuoi criteri. Verifica o modifica i criteri prima di attivare l’avviso gratuito.
Cronologia dell’avviso
Cronologia della procedura di appalto
Segui le fasi principali e gli aggiornamenti relativi a questa procedura di appalto.
Non è stato ancora individuato nessun altro avviso correlato.
I dati sono riorganizzati per agevolarne la lettura. L’avviso ufficiale e i documenti di gara prevalgono sempre.
Fonte e affidabilità
TED · 446176-2026. Verificato il 23 ago 2026, 09:05.
I dati sono riorganizzati per agevolarne la lettura. L’avviso ufficiale e i documenti di gara prevalgono sempre.