BA-26-023-GK Project reserve water Gjøvik-Biri ENT1B Raw water pump station

Gjøvik Kommune · Nórsko

Zobraziť oznámenia pod týmto názvom
Lehota 31. 7. 2026 21:59 UTC
Predpokladaná hodnota95 000 000 NOK
Zverejnené3. 6. 2026
Otvoriť oficiálne oznámenie ↗

Oficiálne zhrnutie · English

Čo je predmetom obstarávania?

Gjøvik municipality is responsible for ensuring a safe and stable delivery of drinking water to the inhabitants of the municipality. In order to strengthen security of supply, it has been decided to establish a full-fledged back-up water system that can supply both Biri and Gjøvik. Stage 1 of the project included the establishment of an submarine pipeline from Gjøvik to Redalen, the construction of a pressure increase station, as well as the establishment of a connection point for the continuation of the pipeline towards Biri. The sea pipeline was lowered in Mjøsa in autumn 2020, and after completion of the pump station the facility was put into operation in 2021. In stage 2 the pipeline shall be continued from Redalen to Biri, where both a raw water pump station and a new water treatment

História oznámení

Časová os verejného obstarávania

Sledujte hlavné etapy a aktualizácie súvisiace s týmto postupom verejného obstarávania.

  1. Oznámenie o verejnom obstarávaní Aktuálne oznámenie

    · TED 382098-2026

    Otvoriť oficiálne oznámenie ↗
  2. Oznámenie o výsledku

    · TED 447485-2026

    Otvoriť oficiálne oznámenie ↗

Údaje sú upravené na ľahšie čítanie. Oficiálne oznámenie a súťažné podklady majú vždy prednosť.

Zdroj a spoľahlivosť

TED · 382098-2026. Overené 22. 8. 2026, 17:05.

Údaje sú upravené na ľahšie čítanie. Oficiálne oznámenie a súťažné podklady majú vždy prednosť.

Nahlásiť chybu e-mailom