Slēgts TED · Avots · Valoda: English

Norvēģija · Būvkonstrukcijas, materiāli un palīgprodukti

Oficiālais nosaukums · English

BA-26-023-GK Project reserve water Gjøvik-Biri ENT1B Raw water pump station

Gjøvik Kommune · Norvēģija

Skatīt paziņojumus ar šo nosaukumu
Termiņš 2026. gada 31. jūl. 21:59 UTC
Paredzamā vērtība95 000 000 NOK
Publicēts2026. gada 3. jūn.
Atvērt oficiālo paziņojumu ↗

Oficiālais kopsavilkums · English

Kas tiek iepirkts?

Gjøvik municipality is responsible for ensuring a safe and stable delivery of drinking water to the inhabitants of the municipality. In order to strengthen security of supply, it has been decided to establish a full-fledged back-up water system that can supply both Biri and Gjøvik. Stage 1 of the project included the establishment of an submarine pipeline from Gjøvik to Redalen, the construction of a pressure increase station, as well as the establishment of a connection point for the continuation of the pipeline towards Biri. The sea pipeline was lowered in Mjøsa in autumn 2020, and after completion of the pump station the facility was put into operation in 2021. In stage 2 the pipeline shall be continued from Redalen to Biri, where both a raw water pump station and a new water treatment

Paziņojuma vēsture

Iepirkuma procedūras laika skala

Sekojiet galvenajiem posmiem un atjauninājumiem, kas saistīti ar šo iepirkuma procedūru.

  1. Konkursa paziņojums Pašreizējais paziņojums

    · TED 382098-2026

    Atvērt oficiālo paziņojumu ↗
  2. Rezultātu paziņojums

    · TED 447485-2026

    Atvērt oficiālo paziņojumu ↗

Dati ir pārstrukturēti vieglākai lasīšanai. Oficiālais paziņojums un iepirkuma dokumenti vienmēr ir noteicošie.

Avots un uzticamība

TED · 382098-2026. Pārbaudīts 2026. gada 22. aug. 17:05.

Dati ir pārstrukturēti vieglākai lasīšanai. Oficiālais paziņojums un iepirkuma dokumenti vienmēr ir noteicošie.

Ziņot par kļūdu e-pastā