Suletud TED · Allikas · Keel: English

Norra · Ehituskonstruktsioonid, materjalid ja abitooted

Ametlik pealkiri · English

BA-26-023-GK Project reserve water Gjøvik-Biri ENT1B Raw water pump station

Gjøvik Kommune · Norra

Vaata selle nimega teateid
Tähtaeg 31. juuli 2026 21:59 UTC
Eeldatav maksumus95 000 000 NOK
Avaldatud3. juuni 2026
Avage ametlik teade ↗

Ametlik kokkuvõte · English

Mida hangitakse?

Gjøvik municipality is responsible for ensuring a safe and stable delivery of drinking water to the inhabitants of the municipality. In order to strengthen security of supply, it has been decided to establish a full-fledged back-up water system that can supply both Biri and Gjøvik. Stage 1 of the project included the establishment of an submarine pipeline from Gjøvik to Redalen, the construction of a pressure increase station, as well as the establishment of a connection point for the continuation of the pipeline towards Biri. The sea pipeline was lowered in Mjøsa in autumn 2020, and after completion of the pump station the facility was put into operation in 2021. In stage 2 the pipeline shall be continued from Redalen to Biri, where both a raw water pump station and a new water treatment

Teate ajalugu

Hankemenetluse ajajoon

Jälgige selle hankemenetlusega seotud põhietappe ja uuendusi.

  1. Hanketeade Praegune teade

    · TED 382098-2026

    Avage ametlik teade ↗
  2. Tulemusteade

    · TED 447485-2026

    Avage ametlik teade ↗

Andmed on lihtsamaks lugemiseks ümber struktureeritud. Alati on ülimuslikud ametlik teade ja hankedokumendid.

Allikas ja usaldusväärsus

TED · 382098-2026. Kontrollitud 22. aug 2026 17:05.

Andmed on lihtsamaks lugemiseks ümber struktureeritud. Alati on ülimuslikud ametlik teade ja hankedokumendid.

Teata veast e-posti teel