BA-26-023-GK Project reserve water Gjøvik-Biri ENT1B Raw water pump station

Gjøvik Kommune · Norvegia

Vezi anunțurile sub acest nume
Termen-limită 31 iul. 2026 21:59 UTC
Valoare estimată95.000.000 NOK
Publicat3 iun. 2026
Deschideți anunțul oficial ↗

Rezumat oficial · English

Ce se achiziționează?

Gjøvik municipality is responsible for ensuring a safe and stable delivery of drinking water to the inhabitants of the municipality. In order to strengthen security of supply, it has been decided to establish a full-fledged back-up water system that can supply both Biri and Gjøvik. Stage 1 of the project included the establishment of an submarine pipeline from Gjøvik to Redalen, the construction of a pressure increase station, as well as the establishment of a connection point for the continuation of the pipeline towards Biri. The sea pipeline was lowered in Mjøsa in autumn 2020, and after completion of the pump station the facility was put into operation in 2021. In stage 2 the pipeline shall be continued from Redalen to Biri, where both a raw water pump station and a new water treatment

Istoricul anunțului

Cronologia procedurii de achiziție

Urmăriți principalele etape și actualizări legate de această procedură de achiziție.

  1. Anunț de participare Anunțul curent

    · TED 382098-2026

    Deschideți anunțul oficial ↗
  2. Anunț privind rezultatul

    · TED 447485-2026

    Deschideți anunțul oficial ↗

Datele sunt restructurate pentru o lectură mai ușoară. Anunțul oficial și documentele achiziției prevalează întotdeauna.

Sursă și fiabilitate

TED · 382098-2026. Verificat la 22 aug. 2026, 17:05.

Datele sunt restructurate pentru o lectură mai ușoară. Anunțul oficial și documentele achiziției prevalează întotdeauna.

Semnalați o eroare prin e-mail