Gesloten TED · Bron · Taal: English

Noorwegen · Bouwconstructies, materialen en ondersteunende producten

Officiële titel · English

BA-26-023-GK Project reserve water Gjøvik-Biri ENT1B Raw water pump station

Gjøvik Kommune · Noorwegen

Bekijk aankondigingen onder deze naam
Termijn 31 jul. 2026 21:59 UTC
Geraamde waarde95.000.000 NOK
Gepubliceerd3 jun. 2026
Officiële aankondiging openen ↗

Officiële samenvatting · English

Wat wordt ingekocht?

Gjøvik municipality is responsible for ensuring a safe and stable delivery of drinking water to the inhabitants of the municipality. In order to strengthen security of supply, it has been decided to establish a full-fledged back-up water system that can supply both Biri and Gjøvik. Stage 1 of the project included the establishment of an submarine pipeline from Gjøvik to Redalen, the construction of a pressure increase station, as well as the establishment of a connection point for the continuation of the pipeline towards Biri. The sea pipeline was lowered in Mjøsa in autumn 2020, and after completion of the pump station the facility was put into operation in 2021. In stage 2 the pipeline shall be continued from Redalen to Biri, where both a raw water pump station and a new water treatment

Historie van de aankondiging

Tijdlijn van de aanbestedingsprocedure

Volg de belangrijkste fasen en updates van deze aanbestedingsprocedure.

  1. Aankondiging van opdracht Huidige aankondiging

    · TED 382098-2026

    Officiële aankondiging openen ↗
  2. Aankondiging van het resultaat

    · TED 447485-2026

    Officiële aankondiging openen ↗

De gegevens zijn voor een betere leesbaarheid geordend. De officiële aankondiging en aanbestedingsstukken zijn altijd doorslaggevend.

Bron en betrouwbaarheid

TED · 382098-2026. Gecontroleerd op 22 aug. 2026 17:05.

De gegevens zijn voor een betere leesbaarheid geordend. De officiële aankondiging en aanbestedingsstukken zijn altijd doorslaggevend.

Een fout melden per e-mail