Zatvoreno TED · Izvor · Jezik: English

Norveška · Građevinske konstrukcije, materijali i pomoćni proizvodi

Službeni naslov · English

BA-26-023-GK Project reserve water Gjøvik-Biri ENT1B Raw water pump station

Gjøvik Kommune · Norveška

Pogledajte objave pod ovim nazivom
Rok 31. srp 2026. 21:59 UTC
Procijenjena vrijednost95 000 000 NOK
Objavljeno3. lip 2026.
Otvorite službenu obavijest ↗

Službeni sažetak · English

Što se nabavlja?

Gjøvik municipality is responsible for ensuring a safe and stable delivery of drinking water to the inhabitants of the municipality. In order to strengthen security of supply, it has been decided to establish a full-fledged back-up water system that can supply both Biri and Gjøvik. Stage 1 of the project included the establishment of an submarine pipeline from Gjøvik to Redalen, the construction of a pressure increase station, as well as the establishment of a connection point for the continuation of the pipeline towards Biri. The sea pipeline was lowered in Mjøsa in autumn 2020, and after completion of the pump station the facility was put into operation in 2021. In stage 2 the pipeline shall be continued from Redalen to Biri, where both a raw water pump station and a new water treatment

Povijest obavijesti

Vremenski slijed postupka nabave

Pratite glavne faze i izmjene povezane s ovim postupkom nabave.

  1. Obavijest o nadmetanju Trenutačna obavijest

    · TED 382098-2026

    Otvorite službenu obavijest ↗
  2. Obavijest o rezultatu

    · TED 447485-2026

    Otvorite službenu obavijest ↗

Podaci su preuređeni radi lakšeg čitanja. Službena obavijest i dokumentacija uvijek imaju prednost.

Izvor i pouzdanost

TED · 382098-2026. Provjereno 22. kol 2026. 17:05.

Podaci su preuređeni radi lakšeg čitanja. Službena obavijest i dokumentacija uvijek imaju prednost.

Prijavite pogrešku e-poštom