Uzavřeno TED · Zdroj · Jazyk: English

Norsko · Stavební konstrukce, materiály a pomocné výrobky

Oficiální název · English

BA-26-023-GK Project reserve water Gjøvik-Biri ENT1B Raw water pump station

Gjøvik Kommune · Norsko

Zobrazit oznámení pod tímto názvem
Lhůta 31. 7. 2026 21:59 UTC
Předpokládaná hodnota95 000 000 NOK
Zveřejněno3. 6. 2026
Otevřít oficiální oznámení ↗

Oficiální shrnutí · English

Co je předmětem zakázky?

Gjøvik municipality is responsible for ensuring a safe and stable delivery of drinking water to the inhabitants of the municipality. In order to strengthen security of supply, it has been decided to establish a full-fledged back-up water system that can supply both Biri and Gjøvik. Stage 1 of the project included the establishment of an submarine pipeline from Gjøvik to Redalen, the construction of a pressure increase station, as well as the establishment of a connection point for the continuation of the pipeline towards Biri. The sea pipeline was lowered in Mjøsa in autumn 2020, and after completion of the pump station the facility was put into operation in 2021. In stage 2 the pipeline shall be continued from Redalen to Biri, where both a raw water pump station and a new water treatment

Historie oznámení

Časová osa zadávacího řízení

Sledujte hlavní fáze a aktualizace spojené s tímto zadávacím řízením.

  1. Oznámení o zahájení zadávacího řízení Aktuální oznámení

    · TED 382098-2026

    Otevřít oficiální oznámení ↗
  2. Oznámení o výsledku

    · TED 447485-2026

    Otevřít oficiální oznámení ↗

Data jsou upravena pro snazší čtení. Oficiální oznámení a zadávací dokumentace mají vždy přednost.

Zdroj a spolehlivost

TED · 382098-2026. Ověřeno 22. 8. 2026 17:05.

Data jsou upravena pro snazší čtení. Oficiální oznámení a zadávací dokumentace mají vždy přednost.

Nahlásit chybu e-mailem