Chiuso TED · Fonte · Lingua: English

Norvegia · Strutture, materiali e prodotti ausiliari per l’edilizia

Titolo ufficiale · English

BA-26-023-GK Project reserve water Gjøvik-Biri ENT1B Raw water pump station

Gjøvik Kommune · Norvegia

Vedi gli avvisi con questo nome
Scadenza 31 lug 2026 21:59 UTC
Valore stimato95.000.000 NOK
Pubblicato3 giu 2026
Apri l’avviso ufficiale ↗

Sintesi ufficiale · English

Che cosa viene acquistato?

Gjøvik municipality is responsible for ensuring a safe and stable delivery of drinking water to the inhabitants of the municipality. In order to strengthen security of supply, it has been decided to establish a full-fledged back-up water system that can supply both Biri and Gjøvik. Stage 1 of the project included the establishment of an submarine pipeline from Gjøvik to Redalen, the construction of a pressure increase station, as well as the establishment of a connection point for the continuation of the pipeline towards Biri. The sea pipeline was lowered in Mjøsa in autumn 2020, and after completion of the pump station the facility was put into operation in 2021. In stage 2 the pipeline shall be continued from Redalen to Biri, where both a raw water pump station and a new water treatment

Cronologia dell’avviso

Cronologia della procedura di appalto

Segui le fasi principali e gli aggiornamenti relativi a questa procedura di appalto.

  1. Bando di gara Avviso corrente

    · TED 382098-2026

    Apri l’avviso ufficiale ↗
  2. Avviso di aggiudicazione

    · TED 447485-2026

    Apri l’avviso ufficiale ↗

I dati sono riorganizzati per agevolarne la lettura. L’avviso ufficiale e i documenti di gara prevalgono sempre.

Fonte e affidabilità

TED · 382098-2026. Verificato il 22 ago 2026, 17:05.

I dati sono riorganizzati per agevolarne la lettura. L’avviso ufficiale e i documenti di gara prevalgono sempre.

Segnala un errore via e-mail