Cerrado TED · Fuente · Idioma: English

Noruega · Estructuras, materiales y productos auxiliares de construcción

Título oficial · English

BA-26-023-GK Project reserve water Gjøvik-Biri ENT1B Raw water pump station

Gjøvik Kommune · Noruega

Ver anuncios con este nombre
Plazo 31 jul. 2026 21:59 UTC
Valor estimado95.000.000 NOK
Publicado3 jun. 2026
Abrir el anuncio oficial ↗

Resumen oficial · English

¿Qué se contrata?

Gjøvik municipality is responsible for ensuring a safe and stable delivery of drinking water to the inhabitants of the municipality. In order to strengthen security of supply, it has been decided to establish a full-fledged back-up water system that can supply both Biri and Gjøvik. Stage 1 of the project included the establishment of an submarine pipeline from Gjøvik to Redalen, the construction of a pressure increase station, as well as the establishment of a connection point for the continuation of the pipeline towards Biri. The sea pipeline was lowered in Mjøsa in autumn 2020, and after completion of the pump station the facility was put into operation in 2021. In stage 2 the pipeline shall be continued from Redalen to Biri, where both a raw water pump station and a new water treatment

Historial del anuncio

Cronología del procedimiento de contratación

Sigue las principales etapas y actualizaciones vinculadas a este procedimiento de contratación.

  1. Anuncio de licitación Anuncio actual

    · TED 382098-2026

    Abrir el anuncio oficial ↗
  2. Anuncio de adjudicación

    · TED 447485-2026

    Abrir el anuncio oficial ↗

Los datos se reestructuran para facilitar su lectura. El anuncio oficial y los documentos de contratación siempre prevalecen.

Fuente y fiabilidad

TED · 382098-2026. Verificado el 22 ago. 2026 17:05.

Los datos se reestructuran para facilitar su lectura. El anuncio oficial y los documentos de contratación siempre prevalecen.

Informar de un error por correo electrónico