Was wird beschafft?
Construction of road improvement scheme to include new footpaths, on-road segregated cycle lane, 4m wide pedestrian and cycle bridge adjacent to the old Bandon Railway Bridge, eastbound and westbound connections to the Bandon Railway Greenway, bus stops, road carriageway widening to 6m, controlled and uncontrolled crossing facilities, Forge Hill/Pouladuff Road junction signals, surface water drainage system, low energy LED public lighting, road lining, signage, hard landscaping, soft landscaping, boundary treatments, etc.
Unverbindliche maschinelle Übersetzung. Die offizielle Zusammenfassung bleibt maßgeblich.
Amtliche Zusammenfassung · English
Construction of road improvement scheme to include new footpaths, on-road segregated cycle lane, 4m wide pedestrian and cycle bridge adjacent to the old Bandon Railway Bridge, eastbound and westbound connections to the Bandon Railway Greenway, bus stops, road carriageway widening to 6m, controlled and uncontrolled crossing facilities, Forge Hill/Pouladuff Road junction signals, surface water drainage system, low energy LED public lighting, road lining, signage, hard landscaping, soft landscaping, boundary treatments, etc.
Bekanntmachungsverlauf
Zeitlicher Ablauf des Vergabeverfahrens
Verfolgen Sie die wichtigsten Phasen und Aktualisierungen dieses Vergabeverfahrens.
Bisher wurde keine weitere zugehörige Bekanntmachung ermittelt.
-
Bekanntmachung vergebener Aufträge Aktuelle Bekanntmachung
· TED 355019-2026
Amtliche Bekanntmachung öffnen ↗
Die Daten werden für eine leichtere Lesbarkeit neu strukturiert. Maßgeblich sind stets die amtliche Bekanntmachung und die Vergabeunterlagen.
Quelle und Verlässlichkeit
TED · 355019-2026. Geprüft am 22.08.2026, 13:05.
Die Daten werden für eine leichtere Lesbarkeit neu strukturiert. Maßgeblich sind stets die amtliche Bekanntmachung und die Vergabeunterlagen.