Sommarju uffiċjali · English
X’qed jiġi akkwistat?
Construction of road improvement scheme to include new footpaths, on-road segregated cycle lane, 4m wide pedestrian and cycle bridge adjacent to the old Bandon Railway Bridge, eastbound and westbound connections to the Bandon Railway Greenway, bus stops, road carriageway widening to 6m, controlled and uncontrolled crossing facilities, Forge Hill/Pouladuff Road junction signals, surface water drainage system, low energy LED public lighting, road lining, signage, hard landscaping, soft landscaping, boundary treatments, etc.
Traduzzjoni awtomatika indikattiva. Is-sommarju uffiċjali jibqa’ r-referenza.
Sommarju uffiċjali · English
Construction of road improvement scheme to include new footpaths, on-road segregated cycle lane, 4m wide pedestrian and cycle bridge adjacent to the old Bandon Railway Bridge, eastbound and westbound connections to the Bandon Railway Greenway, bus stops, road carriageway widening to 6m, controlled and uncontrolled crossing facilities, Forge Hill/Pouladuff Road junction signals, surface water drainage system, low energy LED public lighting, road lining, signage, hard landscaping, soft landscaping, boundary treatments, etc.
Ħieles
Irċievi s-sejħiet li jmiss f’dan is-settur
Irċievi email kull ġimgħa b’avviżi ġodda li jaqblu mal-kriterji tiegħek. Iċċekkja jew aġġusta l-kriterji qabel tattiva t-twissija bla ħlas.
Storja tal-avviżi
Kronoloġija tal-akkwist
Segwi l-istadji ewlenin u l-aġġornamenti marbuta ma’ din il-proċedura ta’ akkwist.
S’issa ma ġie identifikat l-ebda avviż ieħor relatat.
Id-data hija ristrutturata biex tinqara aktar faċilment. L-avviż uffiċjali u d-dokumenti tal-akkwist dejjem jipprevalu.
Sors u affidabbiltà
TED · 355019-2026. Iċċekkjat fil-22 Aww 2026 13:05.
Id-data hija ristrutturata biex tinqara aktar faċilment. L-avviż uffiċjali u d-dokumenti tal-akkwist dejjem jipprevalu.