Rezumat oficial · English
Ce se achiziționează?
Construction of road improvement scheme to include new footpaths, on-road segregated cycle lane, 4m wide pedestrian and cycle bridge adjacent to the old Bandon Railway Bridge, eastbound and westbound connections to the Bandon Railway Greenway, bus stops, road carriageway widening to 6m, controlled and uncontrolled crossing facilities, Forge Hill/Pouladuff Road junction signals, surface water drainage system, low energy LED public lighting, road lining, signage, hard landscaping, soft landscaping, boundary treatments, etc.
Traducere automată orientativă. Rezumatul oficial rămâne referința.
Rezumat oficial · English
Construction of road improvement scheme to include new footpaths, on-road segregated cycle lane, 4m wide pedestrian and cycle bridge adjacent to the old Bandon Railway Bridge, eastbound and westbound connections to the Bandon Railway Greenway, bus stops, road carriageway widening to 6m, controlled and uncontrolled crossing facilities, Forge Hill/Pouladuff Road junction signals, surface water drainage system, low energy LED public lighting, road lining, signage, hard landscaping, soft landscaping, boundary treatments, etc.
Istoricul anunțului
Cronologia procedurii de achiziție
Urmăriți principalele etape și actualizări legate de această procedură de achiziție.
Nu a fost identificat încă niciun alt anunț asociat.
Datele sunt restructurate pentru o lectură mai ușoară. Anunțul oficial și documentele achiziției prevalează întotdeauna.
Sursă și fiabilitate
TED · 355019-2026. Verificat la 22 aug. 2026, 13:05.
Datele sunt restructurate pentru o lectură mai ușoară. Anunțul oficial și documentele achiziției prevalează întotdeauna.