Hivatalos összefoglaló · English
Mi a beszerzés tárgya?
Construction of road improvement scheme to include new footpaths, on-road segregated cycle lane, 4m wide pedestrian and cycle bridge adjacent to the old Bandon Railway Bridge, eastbound and westbound connections to the Bandon Railway Greenway, bus stops, road carriageway widening to 6m, controlled and uncontrolled crossing facilities, Forge Hill/Pouladuff Road junction signals, surface water drainage system, low energy LED public lighting, road lining, signage, hard landscaping, soft landscaping, boundary treatments, etc.
Tájékoztató gépi fordítás. A hivatalos összefoglaló az irányadó.
Hivatalos összefoglaló · English
Construction of road improvement scheme to include new footpaths, on-road segregated cycle lane, 4m wide pedestrian and cycle bridge adjacent to the old Bandon Railway Bridge, eastbound and westbound connections to the Bandon Railway Greenway, bus stops, road carriageway widening to 6m, controlled and uncontrolled crossing facilities, Forge Hill/Pouladuff Road junction signals, surface water drainage system, low energy LED public lighting, road lining, signage, hard landscaping, soft landscaping, boundary treatments, etc.
A hirdetmény előzményei
A közbeszerzési eljárás idővonala
Kövesse a közbeszerzési eljáráshoz kapcsolódó főbb szakaszokat és frissítéseket.
Egyelőre nem azonosítottunk más kapcsolódó hirdetményt.
Az adatokat a könnyebb olvashatóság érdekében átrendezzük. Mindig a hivatalos hirdetmény és a közbeszerzési dokumentumok az irányadók.
Forrás és megbízhatóság
TED · 355019-2026. Ellenőrizve: 2026. aug. 22. 13:05.
Az adatokat a könnyebb olvashatóság érdekében átrendezzük. Mindig a hivatalos hirdetmény és a közbeszerzési dokumentumok az irányadók.