Dámhachtaithe TED · Foinse · Teanga: English

Éire · Oibreacha tógála

Teideal oifigiúil · English

Lehenaghmore Road Improvement Scheme

Cork City Council · Éire

Féach ar fhógraí faoin ainm seo
Spriocdháta Gan fógairt
Luach measta20,789,962 EUR
Foilsithe26 Beal 2026
Oscail an fógra oifigiúil ↗

Achoimre oifigiúil · English

Cad atá á sholáthar?

Construction of road improvement scheme to include new footpaths, on-road segregated cycle lane, 4m wide pedestrian and cycle bridge adjacent to the old Bandon Railway Bridge, eastbound and westbound connections to the Bandon Railway Greenway, bus stops, road carriageway widening to 6m, controlled and uncontrolled crossing facilities, Forge Hill/Pouladuff Road junction signals, surface water drainage system, low energy LED public lighting, road lining, signage, hard landscaping, soft landscaping, boundary treatments, etc.

Stair na bhfógraí

Amlíne an tsoláthair

Lean na príomhchéimeanna agus na nuashonruithe a bhaineann leis an nós imeachta soláthair seo.

Níor sainaithníodh aon fhógra gaolmhar eile go fóill.

  1. Fógra toraidh Fógra reatha

    · TED 355019-2026

    Oscail an fógra oifigiúil ↗

Tá na sonraí athstruchtúrtha chun iad a léamh níos éasca. Is iad an fógra oifigiúil agus na doiciméid soláthair a bhíonn i réim i gcónaí.

Foinse agus iontaofacht

TED · 355019-2026. Seiceáilte ar 22 Lún 2026 13:05.

Tá na sonraí athstruchtúrtha chun iad a léamh níos éasca. Is iad an fógra oifigiúil agus na doiciméid soláthair a bhíonn i réim i gcónaí.

Tuairiscigh earráid trí ríomhphost