Oficiální shrnutí · English
Co je předmětem zakázky?
Construction of road improvement scheme to include new footpaths, on-road segregated cycle lane, 4m wide pedestrian and cycle bridge adjacent to the old Bandon Railway Bridge, eastbound and westbound connections to the Bandon Railway Greenway, bus stops, road carriageway widening to 6m, controlled and uncontrolled crossing facilities, Forge Hill/Pouladuff Road junction signals, surface water drainage system, low energy LED public lighting, road lining, signage, hard landscaping, soft landscaping, boundary treatments, etc.
Orientační strojový překlad. Rozhodující zůstává oficiální shrnutí.
Oficiální shrnutí · English
Construction of road improvement scheme to include new footpaths, on-road segregated cycle lane, 4m wide pedestrian and cycle bridge adjacent to the old Bandon Railway Bridge, eastbound and westbound connections to the Bandon Railway Greenway, bus stops, road carriageway widening to 6m, controlled and uncontrolled crossing facilities, Forge Hill/Pouladuff Road junction signals, surface water drainage system, low energy LED public lighting, road lining, signage, hard landscaping, soft landscaping, boundary treatments, etc.
Historie oznámení
Časová osa zadávacího řízení
Sledujte hlavní fáze a aktualizace spojené s tímto zadávacím řízením.
Dosud nebylo nalezeno žádné další související oznámení.
Data jsou upravena pro snazší čtení. Oficiální oznámení a zadávací dokumentace mají vždy přednost.
Zdroj a spolehlivost
TED · 355019-2026. Ověřeno 22. 8. 2026 13:05.
Data jsou upravena pro snazší čtení. Oficiální oznámení a zadávací dokumentace mají vždy přednost.