Službeni sažetak · English
Što se nabavlja?
Construction of road improvement scheme to include new footpaths, on-road segregated cycle lane, 4m wide pedestrian and cycle bridge adjacent to the old Bandon Railway Bridge, eastbound and westbound connections to the Bandon Railway Greenway, bus stops, road carriageway widening to 6m, controlled and uncontrolled crossing facilities, Forge Hill/Pouladuff Road junction signals, surface water drainage system, low energy LED public lighting, road lining, signage, hard landscaping, soft landscaping, boundary treatments, etc.
Strojni prijevod za lakše razumijevanje. Službeni sažetak ostaje mjerodavan.
Službeni sažetak · English
Construction of road improvement scheme to include new footpaths, on-road segregated cycle lane, 4m wide pedestrian and cycle bridge adjacent to the old Bandon Railway Bridge, eastbound and westbound connections to the Bandon Railway Greenway, bus stops, road carriageway widening to 6m, controlled and uncontrolled crossing facilities, Forge Hill/Pouladuff Road junction signals, surface water drainage system, low energy LED public lighting, road lining, signage, hard landscaping, soft landscaping, boundary treatments, etc.
Povijest obavijesti
Vremenski slijed postupka nabave
Pratite glavne faze i izmjene povezane s ovim postupkom nabave.
Još nije pronađena nijedna druga povezana obavijest.
Podaci su preuređeni radi lakšeg čitanja. Službena obavijest i dokumentacija uvijek imaju prednost.
Izvor i pouzdanost
TED · 355019-2026. Provjereno 22. kol 2026. 13:05.
Podaci su preuređeni radi lakšeg čitanja. Službena obavijest i dokumentacija uvijek imaju prednost.