Officiële samenvatting · English
Wat wordt ingekocht?
Construction of road improvement scheme to include new footpaths, on-road segregated cycle lane, 4m wide pedestrian and cycle bridge adjacent to the old Bandon Railway Bridge, eastbound and westbound connections to the Bandon Railway Greenway, bus stops, road carriageway widening to 6m, controlled and uncontrolled crossing facilities, Forge Hill/Pouladuff Road junction signals, surface water drainage system, low energy LED public lighting, road lining, signage, hard landscaping, soft landscaping, boundary treatments, etc.
Machinevertaling ter ondersteuning. De officiële samenvatting blijft leidend.
Officiële samenvatting · English
Construction of road improvement scheme to include new footpaths, on-road segregated cycle lane, 4m wide pedestrian and cycle bridge adjacent to the old Bandon Railway Bridge, eastbound and westbound connections to the Bandon Railway Greenway, bus stops, road carriageway widening to 6m, controlled and uncontrolled crossing facilities, Forge Hill/Pouladuff Road junction signals, surface water drainage system, low energy LED public lighting, road lining, signage, hard landscaping, soft landscaping, boundary treatments, etc.
Historie van de aankondiging
Tijdlijn van de aanbestedingsprocedure
Volg de belangrijkste fasen en updates van deze aanbestedingsprocedure.
Er is nog geen andere gerelateerde aankondiging gevonden.
-
Aankondiging van het resultaat Huidige aankondiging
· TED 355019-2026
Officiële aankondiging openen ↗
De gegevens zijn voor een betere leesbaarheid geordend. De officiële aankondiging en aanbestedingsstukken zijn altijd doorslaggevend.
Bron en betrouwbaarheid
TED · 355019-2026. Gecontroleerd op 22 aug. 2026 13:05.
De gegevens zijn voor een betere leesbaarheid geordend. De officiële aankondiging en aanbestedingsstukken zijn altijd doorslaggevend.