LTE Investment for Unit 1 in the Waste incineration Plant AFA in Uppsala, Sweden. The waste incineration plant in Uppsala consists of a total of three waste boilers, two of which are from the 80s and one that was commissioned in 2005. The waste incinerators are the base production units of district heating and steam in Uppsala. In the old waste boiler, Unit 1, it is time to replace pressure vessel parts (convection parts) in order to continue operations until 2040. Other parts (membrane walls in furnace and the so-called “lattice tubes” have previously been replaced and supplemented with overlay welding. The steam data is 15 bar(g) and 200°C for both boiler.…
Traducción automática orientativa. El resumen oficial sigue siendo la referencia.
Resumen oficial · Svenska
LTE Investment for Unit 1 in the Waste incineration Plant AFA in Uppsala, Sweden. The waste incineration plant in Uppsala consists of a total of three waste boilers, two of which are from the 80s and one that was commissioned in 2005. The waste incinerators are the base production units of district heating and steam in Uppsala. In the old waste boiler, Unit 1, it is time to replace pressure vessel parts (convection parts) in order to continue operations until 2040. Other parts (membrane walls in furnace and the so-called “lattice tubes” have previously been replaced and supplemented with overlay welding. The steam data is 15 bar(g) and 200°C for both boiler.…
Historial del anuncio
Cronología del procedimiento de contratación
Sigue las principales etapas y actualizaciones vinculadas a este procedimiento de contratación.
Todavía no se ha identificado ningún otro anuncio relacionado.
Los datos se reestructuran para facilitar su lectura. El anuncio oficial y los documentos de contratación siempre prevalecen.
Fuente y fiabilidad
TED · 502959-2026. Verificado el 23 ago. 2026 20:05.
Los datos se reestructuran para facilitar su lectura. El anuncio oficial y los documentos de contratación siempre prevalecen.