Officielt resumé · Svenska
Hvad indkøbes?
LTE Investment for Unit 1 in the Waste incineration Plant AFA in Uppsala, Sweden. The waste incineration plant in Uppsala consists of a total of three waste boilers, two of which are from the 80s and one that was commissioned in 2005. The waste incinerators are the base production units of district heating and steam in Uppsala. In the old waste boiler, Unit 1, it is time to replace pressure vessel parts (convection parts) in order to continue operations until 2040. Other parts (membrane walls in furnace and the so-called “lattice tubes” have previously been replaced and supplemented with overlay welding. The steam data is 15 bar(g) and 200°C for both boiler.…
Vejledende maskinoversættelse. Det officielle resumé er fortsat gældende.
Officielt resumé · Svenska
LTE Investment for Unit 1 in the Waste incineration Plant AFA in Uppsala, Sweden. The waste incineration plant in Uppsala consists of a total of three waste boilers, two of which are from the 80s and one that was commissioned in 2005. The waste incinerators are the base production units of district heating and steam in Uppsala. In the old waste boiler, Unit 1, it is time to replace pressure vessel parts (convection parts) in order to continue operations until 2040. Other parts (membrane walls in furnace and the so-called “lattice tubes” have previously been replaced and supplemented with overlay welding. The steam data is 15 bar(g) and 200°C for both boiler.…
Meddelelseshistorik
Udbudsforløb
Følg de vigtigste faser og opdateringer i dette udbud.
Der er endnu ikke fundet en anden relateret meddelelse.
Data er omstruktureret for at være lettere at læse. Den officielle meddelelse og udbudsdokumenterne er altid gældende.
Kilde og pålidelighed
TED · 502959-2026. Kontrolleret 23. aug. 2026 20.05.
Data er omstruktureret for at være lettere at læse. Den officielle meddelelse og udbudsdokumenterne er altid gældende.