LTE Investment for Unit 1 in the Waste incineration Plant AFA in Uppsala, Sweden. The waste incineration plant in Uppsala consists of a total of three waste boilers, two of which are from the 80s and one that was commissioned in 2005. The waste incinerators are the base production units of district heating and steam in Uppsala. In the old waste boiler, Unit 1, it is time to replace pressure vessel parts (convection parts) in order to continue operations until 2040. Other parts (membrane walls in furnace and the so-called “lattice tubes” have previously been replaced and supplemented with overlay welding. The steam data is 15 bar(g) and 200°C for both boiler.…
Suuntaa antava konekäännös. Virallinen yhteenveto on edelleen ensisijainen.
Virallinen yhteenveto · Svenska
LTE Investment for Unit 1 in the Waste incineration Plant AFA in Uppsala, Sweden. The waste incineration plant in Uppsala consists of a total of three waste boilers, two of which are from the 80s and one that was commissioned in 2005. The waste incinerators are the base production units of district heating and steam in Uppsala. In the old waste boiler, Unit 1, it is time to replace pressure vessel parts (convection parts) in order to continue operations until 2040. Other parts (membrane walls in furnace and the so-called “lattice tubes” have previously been replaced and supplemented with overlay welding. The steam data is 15 bar(g) and 200°C for both boiler.…
Ilmoitushistoria
Hankintamenettelyn aikajana
Seuraa tähän hankintamenettelyyn liittyviä päävaiheita ja päivityksiä.
Muita tähän liittyviä ilmoituksia ei ole vielä tunnistettu.
Tiedot on jäsennetty helpommin luettaviksi. Virallinen ilmoitus ja hankinta-asiakirjat ovat aina ratkaisevia.
Lähde ja luotettavuus
TED · 502959-2026. Tarkistettu 23.8.2026 klo 20.05.
Tiedot on jäsennetty helpommin luettaviksi. Virallinen ilmoitus ja hankinta-asiakirjat ovat aina ratkaisevia.