LTE Investment for Unit 1 in the Waste incineration Plant AFA in Uppsala, Sweden. The waste incineration plant in Uppsala consists of a total of three waste boilers, two of which are from the 80s and one that was commissioned in 2005. The waste incinerators are the base production units of district heating and steam in Uppsala. In the old waste boiler, Unit 1, it is time to replace pressure vessel parts (convection parts) in order to continue operations until 2040. Other parts (membrane walls in furnace and the so-called “lattice tubes” have previously been replaced and supplemented with overlay welding. The steam data is 15 bar(g) and 200°C for both boiler.…
Informacinis mašininis vertimas. Oficialiai santraukai ir toliau teikiama pirmenybė.
Oficiali santrauka · Svenska
LTE Investment for Unit 1 in the Waste incineration Plant AFA in Uppsala, Sweden. The waste incineration plant in Uppsala consists of a total of three waste boilers, two of which are from the 80s and one that was commissioned in 2005. The waste incinerators are the base production units of district heating and steam in Uppsala. In the old waste boiler, Unit 1, it is time to replace pressure vessel parts (convection parts) in order to continue operations until 2040. Other parts (membrane walls in furnace and the so-called “lattice tubes” have previously been replaced and supplemented with overlay welding. The steam data is 15 bar(g) and 200°C for both boiler.…
Skelbimo istorija
Pirkimo procedūros laiko juosta
Sekite pagrindinius šios pirkimo procedūros etapus ir atnaujinimus.
Kol kas nenustatyta jokių kitų susijusių skelbimų.
Duomenys pertvarkyti, kad būtų lengviau skaityti. Oficialus skelbimas ir pirkimo dokumentai visada turi pirmenybę.
Šaltinis ir patikimumas
TED · 502959-2026. Patikrinta 2026-08-23 20:05.
Duomenys pertvarkyti, kad būtų lengviau skaityti. Oficialus skelbimas ir pirkimo dokumentai visada turi pirmenybę.