Oficiālais kopsavilkums · Svenska
Kas tiek iepirkts?
LTE Investment for Unit 1 in the Waste incineration Plant AFA in Uppsala, Sweden. The waste incineration plant in Uppsala consists of a total of three waste boilers, two of which are from the 80s and one that was commissioned in 2005. The waste incinerators are the base production units of district heating and steam in Uppsala. In the old waste boiler, Unit 1, it is time to replace pressure vessel parts (convection parts) in order to continue operations until 2040. Other parts (membrane walls in furnace and the so-called “lattice tubes” have previously been replaced and supplemented with overlay welding. The steam data is 15 bar(g) and 200°C for both boiler.…
Informatīvs mašīntulkojums. Oficiālais kopsavilkums joprojām ir noteicošais.
Oficiālais kopsavilkums · Svenska
LTE Investment for Unit 1 in the Waste incineration Plant AFA in Uppsala, Sweden. The waste incineration plant in Uppsala consists of a total of three waste boilers, two of which are from the 80s and one that was commissioned in 2005. The waste incinerators are the base production units of district heating and steam in Uppsala. In the old waste boiler, Unit 1, it is time to replace pressure vessel parts (convection parts) in order to continue operations until 2040. Other parts (membrane walls in furnace and the so-called “lattice tubes” have previously been replaced and supplemented with overlay welding. The steam data is 15 bar(g) and 200°C for both boiler.…
Paziņojuma vēsture
Iepirkuma procedūras laika skala
Sekojiet galvenajiem posmiem un atjauninājumiem, kas saistīti ar šo iepirkuma procedūru.
Cits saistīts paziņojums vēl nav identificēts.
Dati ir pārstrukturēti vieglākai lasīšanai. Oficiālais paziņojums un iepirkuma dokumenti vienmēr ir noteicošie.
Avots un uzticamība
TED · 502959-2026. Pārbaudīts 2026. gada 23. aug. 20:05.
Dati ir pārstrukturēti vieglākai lasīšanai. Oficiālais paziņojums un iepirkuma dokumenti vienmēr ir noteicošie.