Officiell sammanfattning
Vad upphandlas?
LTE Investment for Unit 1 in the Waste incineration Plant AFA in Uppsala, Sweden. The waste incineration plant in Uppsala consists of a total of three waste boilers, two of which are from the 80s and one that was commissioned in 2005. The waste incinerators are the base production units of district heating and steam in Uppsala. In the old waste boiler, Unit 1, it is time to replace pressure vessel parts (convection parts) in order to continue operations until 2040. Other parts (membrane walls in furnace and the so-called “lattice tubes” have previously been replaced and supplemented with overlay welding. The steam data is 15 bar(g) and 200°C for both boiler.…
Meddelandehistorik
Tidslinje för upphandlingsförfarandet
Följ de viktigaste stegen och uppdateringarna som är kopplade till det här upphandlingsförfarandet.
Inget annat relaterat meddelande har ännu identifierats.
Uppgifterna har strukturerats om för att bli lättare att läsa. Det officiella meddelandet och upphandlingsdokumenten gäller alltid.
Källa och tillförlitlighet
TED · 502959-2026. Kontrollerad 23 aug. 2026 20:05.
Uppgifterna har strukturerats om för att bli lättare att läsa. Det officiella meddelandet och upphandlingsdokumenten gäller alltid.