Rezumat oficial · Svenska
Ce se achiziționează?
LTE Investment for Unit 1 in the Waste incineration Plant AFA in Uppsala, Sweden. The waste incineration plant in Uppsala consists of a total of three waste boilers, two of which are from the 80s and one that was commissioned in 2005. The waste incinerators are the base production units of district heating and steam in Uppsala. In the old waste boiler, Unit 1, it is time to replace pressure vessel parts (convection parts) in order to continue operations until 2040. Other parts (membrane walls in furnace and the so-called “lattice tubes” have previously been replaced and supplemented with overlay welding. The steam data is 15 bar(g) and 200°C for both boiler.…
Traducere automată orientativă. Rezumatul oficial rămâne referința.
Rezumat oficial · Svenska
LTE Investment for Unit 1 in the Waste incineration Plant AFA in Uppsala, Sweden. The waste incineration plant in Uppsala consists of a total of three waste boilers, two of which are from the 80s and one that was commissioned in 2005. The waste incinerators are the base production units of district heating and steam in Uppsala. In the old waste boiler, Unit 1, it is time to replace pressure vessel parts (convection parts) in order to continue operations until 2040. Other parts (membrane walls in furnace and the so-called “lattice tubes” have previously been replaced and supplemented with overlay welding. The steam data is 15 bar(g) and 200°C for both boiler.…
Istoricul anunțului
Cronologia procedurii de achiziție
Urmăriți principalele etape și actualizări legate de această procedură de achiziție.
Nu a fost identificat încă niciun alt anunț asociat.
Datele sunt restructurate pentru o lectură mai ușoară. Anunțul oficial și documentele achiziției prevalează întotdeauna.
Sursă și fiabilitate
TED · 502959-2026. Verificat la 23 aug. 2026, 20:05.
Datele sunt restructurate pentru o lectură mai ușoară. Anunțul oficial și documentele achiziției prevalează întotdeauna.