Geophysical surveys for installation engineering of Offshore Substations and Submarine Cable Routes (excluding Landfall)

RTE Réseau de Transport d'Electricité · France

View notices under this name
Official summary

RTE, the French electricity transmission system operator, is responsible for the development, implementation and operation of the connection of offshore wind farms to the French public power transmission system. In this context, RTE intends to carry out Geophysical surveys for its future Offshore Substations and Submarine Cables (excluding Landfall). The purpose of this Contract notice is to introduce the 3 potential waves of call for tenders covering…

What is being procured?
Deadline Not announced
Estimated valueNot announced
PublishedJun 30, 2026
Open official notice ↗

Official summary

What is being procured?

RTE, the French electricity transmission system operator, is responsible for the development, implementation and operation of the connection of offshore wind farms to the French public power transmission system. In this context, RTE intends to carry out Geophysical surveys for its future Offshore Substations and Submarine Cables (excluding Landfall). The purpose of this Contract notice is to introduce the 3 potential waves of call for tenders covering some Geophysical survey needs in the coming years and in particular from 2025 to 2026. Estimated number of projects from 2025 to 2026: 4 projects. RTE reserves the right to cancel or add a project.

Notice history

Procurement timeline

Follow the main stages and updates linked to this procurement procedure.

No other related notice has been identified yet.

  1. Result notice Notice being viewed

    · TED 448163-2026

    Open official notice ↗

Data is restructured for easier reading. The official notice and procurement documents always prevail.

Source and reliability

TED · 448163-2026. Checked on Aug 23, 2026, 10:05 AM.

Data is restructured for easier reading. The official notice and procurement documents always prevail.