Résumé officiel · English
Quel est l’objet du marché ?
RTE, the French electricity transmission system operator, is responsible for the development, implementation and operation of the connection of offshore wind farms to the French public power transmission system. In this context, RTE intends to carry out Geophysical surveys for its future Offshore Substations and Submarine Cables (excluding Landfall). The purpose of this Contract notice is to introduce the 3 potential waves of call for tenders covering some Geophysical survey needs in the coming years and in particular from 2025 to 2026. Estimated number of projects from 2025 to 2026: 4 projects. RTE reserves the right to cancel or add a project.
Traduction automatique indicative. Le résumé officiel reste la référence.
Résumé officiel · English
RTE, the French electricity transmission system operator, is responsible for the development, implementation and operation of the connection of offshore wind farms to the French public power transmission system. In this context, RTE intends to carry out Geophysical surveys for its future Offshore Substations and Submarine Cables (excluding Landfall). The purpose of this Contract notice is to introduce the 3 potential waves of call for tenders covering some Geophysical survey needs in the coming years and in particular from 2025 to 2026. Estimated number of projects from 2025 to 2026: 4 projects. RTE reserves the right to cancel or add a project.
Historique de l’avis
Chronologie de la procédure
Suivez les principales étapes et mises à jour liées à cette procédure de passation.
Aucun autre avis lié n’a encore été identifié.
Les données sont restructurées pour en faciliter la lecture. L’avis officiel et les documents du marché font toujours foi.
Source et fiabilité
TED · 448163-2026. Vérifié le 23 août 2026 à 10:05.
Les données sont restructurées pour en faciliter la lecture. L’avis officiel et les documents du marché font toujours foi.